THE KNOT GUIDE
KNOT 04

Figure-8 Knot: On a Bight

Create a strong fixed loop without needing access to the end of the rope.

2 min readFrom the book by Brett C Johnson

Figure-8 Knot: On a Bight — illustration from the book

The Figure-8 On a Bight creates a load-carrying loop in the rope. Because you form it from a bight, you do not need to thread the rope end around an existing object first.

That makes it useful for clipping a carabiner into the finished loop, connecting to anchors or systems, and creating a clean loop that is easy for the group to inspect.

PROS

Creates a secure loop for clipping into anchors, carabiners, or harness systems.

Easy to identify and inspect.

Usually straightforward to untie after normal loading.

CONS

Bulkier than some alternatives.

CAUTION: Dress the knot carefully. A recognizable knot is not automatically a correctly dressed knot.

CANYONEERING USAGE

Create a fixed loop at the end of a rope for clipping to an appropriate carabiner or anchor system.

Create a strong, easy-to-inspect attachment loop without needing access to the rope end.

Use as an attachment point in hauling, lowering, or rescue systems when the chosen system calls for a fixed loop.

Create a master or connection loop in rope-based rigging where a Figure-8 on a Bight is appropriate.

ADDITIONAL READING:

• CanyoneeringUSA – Figure Eight on a Bight and Variations
• Petzl – Knots (Figure-Eight for the Anchor)
• CMC Pro – Learn How to Tie a Figure 8 on a Bight
• The Mountaineers – Standard Techniques
• CMC Pro – Popular Knots and Bends for Rope Access
• CMC Pro – Evaluating Rescue Knot Efficiency in 11 mm General Use Ropes

FIGURE-8 KNOT ON A BIGHT

01

Fold the rope to create a bight, keeping the two strands parallel and free of twists.

Figure-8 Knot: On a Bight — illustration from the book

02

Cross the bight over the doubled standing strands to create the first loop.

Figure-8 Knot: On a Bight — illustration from the book

FIGURE-8 KNOT ON A BIGHT

03

Carry the bight around and behind the doubled standing strands, keeping both rope sections together.

Figure-8 Knot: On a Bight — illustration from the book

04

Bring the bight back to the front and pass it through the original opening as shown.

Figure-8 Knot: On a Bight — illustration from the book

FIGURE-8 KNOT ON A BIGHT

05

Pull the bight through and begin dressing the knot. Keep the four rope sections neatly side by side with no unnecessary crossings.

Figure-8 Knot: On a Bight — illustration from the book

06

Snug the knot by pulling on the standing strands and the loop. The finished Figure-8 should be compact, symmetrical, and easy to inspect.

Figure-8 Knot: On a Bight — illustration from the book

FIGURE-8 KNOT ON A BIGHT

07

Compare the strand path with Steps 5–6. The photo below is a look-alike, NOT a properly tied Figure-8 on a Bight. If the path does not match, untie it and start over.

Figure-8 Knot: On a Bight — illustration from the book

KNOT GUIDE

Search the guide

Modules, knots, and the complete book.